The client's expectations extended beyond the theatre to a fully integrated technology ecosystem spanning lighting, shading, audio, video, surveillance, and control.
ETC Florida built the project around a direct-view LG MAGNIT video wall after an intensive, iterative design process with the builder and CinemaTech evaluated projection versus direct-view LED and repeatedly reworked seating layouts within fixed constraints.
That theatre-level precision was carried across the rest of the home, where centralised lighting, integrated shading, distributed audio/video, enterprise-grade networking, surveillance, and control were engineered as one coordinated ecosystem rather than independent installs.
The room layout, sightlines, and seating were engineered around the permanent structural obstruction rather than an open shell, since the shaft could not be relocated.
Multiple display technologies were evaluated, including projection and direct-view LED, and seating layouts were reworked repeatedly to maximise capacity within fixed walls.
Panel calibration, structural support, and installation tolerances were addressed through detailed pre-planning, manufacturer coordination, and on-site precision adjustments.
Working with CinemaTech, speakers were fully concealed behind acoustically transparent fabric wall systems, integrating sound treatment into the room's finish design.